Our Projects
Cargo we've moved.
Mining equipment, floating dock components, steel structures, engineering vehicles, and prefabricated buildings. Real cargo moved on our corridor.
Mining Equipment Delivery to Lae, PNG
4 x CAT 785D haul trucks (120 tonnes each), disassembled for transport with boom arms, axles, and chassis loaded as separate break bulk units
View project →China Railway First Group Kiribati Project
Steel structures and equipment for the Kiribati project of China Railway First Group Co., Ltd., shipped from China and loaded as break bulk.
View project →Floating Dock Project
Floating dock components transported as break bulk.
View project →Have cargo that needs moving?
Send your packing list, cargo details, origin, and destination. We'll come back with options.
Request a Quote